h1

Outside work is done!

November 5, 2009

The first round of fellas have completed their outside work on the family room:

Outside done

If you look at my earlier post, you will get the before and after effect. This is before the guttering was put up — that turned out nice too.  They did a good job with the siding — you’d never know that there was ever a breezeway originally attaching the two buildings.

The flagstone patio (not shown) is a bit worse for wear, but it needs reset anyway — we didn’t know what we were doing at the time.

Not sure how my hollyhocks or Joe Pye fared being tromped on and such, but I saved hollyhock seed and have a Joe in the front that I need to move to the back anyway. Besides…I’ve been toying with the idea of putting a smallish spirea bush in the corner there…

Spring should be interesting…

And here is what happened to my kitchen window:

Kitchen windowThe vaulted roof line just clipped it, but according to the contractor, he will come up with something creative to handle a pass through type of thing

Anyway — now it is the plumber’s turn to install the radiant floor heating — I am really curious as to how that will be accomplished.

Went to the carpet place today to get a very rough estimate, go over the wood laminate selection I made earlier — I think I am staying with it — and also to look at DuraCeramic tile for the entryway and laundry/bathroom. I still hate shopping, but so far all the salespeople have been helpful and not at all pushy.

********************************

NP: FlashForward, but I am not paying close attention. I think V will be taking the place of that. And of course there is Fringe — I’ve been missing my weekly dose of Walter.

Where’s Sophie? On the couch where she can lick the TV tray. Ew. Leave it, Sophie!!

Leave a Comment